How net metering is evaluated
Eligibility depends on consumer category, sanctioned load, transformer capacity, technical feasibility, system capacity, metering arrangement, and current rules. The safest path is to verify before procurement.
- Consumer category check
- Sanctioned load and bill review
- Capacity and transformer feasibility
- Application and document submission
- Inspection and meter commissioning