Subsidy Support

PM Surya Ghar in Jaipur

PM Surya Ghar: Muft Bijli Yojana provides direct cash subsidies to Jaipur households installing rooftop solar. SOLGURU manages the entire lifecycle—from the National Portal application to JVVNL feasibility, DCR-compliant installation, joint inspection, and final DBT release. We ensure your system meets the strict June 2026 ALMM rules so your payout is guaranteed.

SchemePM Surya Ghar: Muft Bijli Yojana
Up to 2 kW Subsidy₹30,000 per kW
Max Central Subsidy₹78,000 (for 3 kW+)
State Top-upApprox. ₹17,000

The Exact 2026 Subsidy Math

The subsidy is calculated in two tiers and capped at 3 kW. For the first 2 kW, you get ₹30,000 per kW. For the 3rd kW, you get ₹18,000. Any capacity above 3 kW gets zero additional subsidy. On top of this, the Government of Rajasthan provides an additional state subsidy (roughly ₹17,000), making the total financial aid highly attractive.

  • 1 kW System: ₹30,000 Central + State Top-up
  • 2 kW System: ₹60,000 Central + State Top-up
  • 3 kW System (or higher): ₹78,000 Central + State Top-up
  • Funds are transferred directly via Direct Benefit Transfer (DBT) to your bank

The #1 Cause of Subsidy Rejection: ALMM Compliance

The MNRE has zero tolerance for non-compliant equipment. As of June 1, 2026, the ALMM List-II mandate means your solar panels MUST be made with Indian-manufactured solar cells. If an installer uses imported cells, the JVVNL inspector will reject the system. SOLGURU provides complete transparency and manufacturer documentation to guarantee DCR compliance.

  • List-I (Modules) and List-II (Cells) compliance is mandatory
  • Pre-June stranded projects must apply for the NISE portal exemption immediately
  • Name on electricity bill MUST exactly match bank account and Aadhaar
Planning Data

Quick Sizing Context

Application StepCritical CheckpointSOLGURU Action
Initial RegistrationName/KYC MismatchWe verify bill name against Aadhaar before applying
Technical FeasibilitySanctioned Load LimitWe process load extension with JVVNL if required
InstallationDCR/ALMM ComplianceWe supply only certified, barcode-verifiable DCR panels
Inspection & CommissioningAnti-islanding SafetyWe install proper ACDB/DCDB & earthing to pass inspection
Direct Answers

Frequently Asked Questions

No. The PM Surya Ghar scheme operates on a Direct Benefit Transfer (DBT) model. You pay the EPC (SOLGURU) for the installation, and the government transfers the subsidy money directly into your bank account 15-30 days after the net meter is commissioned.

Yes, but the subsidy amount is capped. Whether you install 3 kW, 5 kW, or 10 kW, the maximum Central Subsidy you will receive is ₹78,000.

Next Steps

Get a site-specific solar plan.

Share your latest electricity bill and roof or facility details. SOLGURU will map system size, approvals, equipment, payback, and execution timeline.